Electrical (RGIE, Consuel, IRVE) and HVAC / Heat pumps (F-Gas, RGE)
Track RGIE/Consuel electrical inspections, EV chargers, the F-Gas refrigerant log (EU 2024/573) and RGE qualifications.
01
Electrical: RGIE (Belgium), Consuel and IRVE (France)
In electrical records, log the approved inspection body, single-line and position diagram status, and inspection result.
In Belgium, IVERNEXT automatically computes the compliance deadline after a negative report (18 months for a pre-1981 installation sale, 12 months otherwise) or the 25-year periodic inspection.
02
HVAC & heat pumps: F-Gas Regulation (EU) 2024/573 and RGE
The F-Gas module computes CO₂ equivalents for HFCs (annual leak check from 5 t CO₂-eq.) and mass thresholds for Annex II HFOs (from 1 kg under Regulation EU 2024/573).
Your RGE, IRVE and F-Gas certificate numbers configured in Settings are automatically printed on your quotes and invoices.